Triple

T26852882
Position Surface form Disambiguated ID Type / Status
Subject F-35 Integrated Training Center E676105 entity
Predicate instanceOf P0 FINISHED
Object maintenance training center C50784 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maintenance training center
Context triple: [F-35 Integrated Training Center, instanceOf, maintenance training center]
  • A. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • B. educational training facility chosen
    An educational training facility is a dedicated place where individuals receive structured instruction and hands-on practice to develop specific knowledge, skills, or competencies.
  • C. public safety training facility
    A public safety training facility is a specialized center where emergency responders and related personnel receive practical and scenario-based instruction to prepare for real-world safety, rescue, and disaster situations.
  • D. national training center
    A national training center is a centralized facility dedicated to providing standardized, high-level education, skill development, and certification programs that support a country’s strategic workforce, professional, or athletic objectives.
  • E. aviation training organization
    An aviation training organization is an entity that provides structured education, practical instruction, and certification preparation for pilots, aircrew, and other aviation professionals in accordance with regulatory standards.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9b9d7708190a15d7485709ae981 completed April 27, 2026, 4:44 a.m.
Created at: April 27, 2026, 5:18 a.m.