Triple
T26852188
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISS Assembly Sequence 12A |
E676086
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | space station construction phase |
C14566
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: space station construction phase Context triple: [ISS Assembly Sequence 12A, instanceOf, space station construction phase]
-
A.
series of space stations
A series of space stations is a sequentially developed set of orbital habitats or platforms, each designed to support human or robotic activities in space and often building on the technology and infrastructure of its predecessors.
-
B.
orbital space station
An orbital space station is a large, habitable artificial structure that continuously orbits a celestial body, serving as a long-term platform for human presence, research, and operations in space.
-
C.
crewed space station
A crewed space station is a permanently or semi-permanently inhabited orbital facility that supports human life and scientific, technological, or operational activities in space.
-
D.
space infrastructure project
A space infrastructure project is a large-scale, coordinated initiative to design, build, and operate physical and digital systems that enable sustained activities and services in space, such as communication, transportation, energy, and research.
-
E.
spaceflight program phase
chosen
A spaceflight program phase is a distinct, time-bounded stage within a space mission or program that groups related objectives, activities, and resources to achieve specific milestones in the overall mission lifecycle.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9b9d7708190a15d7485709ae981 |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:18 a.m.