Triple
T26852187
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISS Assembly Sequence 12A |
E676086
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ISS assembly sequence |
C52123
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ISS assembly sequence Context triple: [ISS Assembly Sequence 12A, instanceOf, ISS assembly sequence]
-
A.
rocket assembly building
A rocket assembly building is a large, specialized facility where rocket components are constructed, integrated, and prepared for testing and launch.
-
B.
joint planning and execution system
A joint planning and execution system is an integrated framework that enables multiple agents or stakeholders to collaboratively create, coordinate, and carry out shared plans toward common goals in dynamic environments.
-
C.
program of the American Society of Mechanical Engineers
A program of the American Society of Mechanical Engineers is an organized set of activities, initiatives, or services designed to advance mechanical engineering knowledge, practice, standards, and professional development for its members and the broader engineering community.
-
D.
modular load-carrying system
A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
-
E.
Space Shuttle payload handling system
A Space Shuttle payload handling system is the integrated set of mechanical, electronic, and software components used to secure, manipulate, deploy, and retrieve payloads within the orbiter’s payload bay during space missions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9b9d7708190a15d7485709ae981 |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:18 a.m.