Triple
T2684925
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | St Giles-in-the-Fields, London |
E57460
|
entity |
| Predicate | centuryOfCurrentBuilding |
P11509
|
FINISHED |
| Object | 18th century |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 18th century | Statement: [St Giles-in-the-Fields, London, centuryOfCurrentBuilding, 18th century]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: centuryOfCurrentBuilding Context triple: [St Giles-in-the-Fields, London, centuryOfCurrentBuilding, 18th century]
-
A.
constructionCentury
Indicates the century during which something was constructed or built.
-
B.
originalBuildingDemolishedInCentury
Indicates that the original building was demolished at some point during the specified century.
-
C.
rebuiltInCentury
chosen
Indicates that an existing structure or entity was reconstructed or significantly rebuilt during a specified century.
-
D.
yearBuilt
Indicates the specific year in which something (typically a structure or object) was constructed or completed.
-
E.
eraOfMajorConstruction
Indicates the time period during which the primary or most significant phase of construction for an entity took place.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4a5028388190a36f3baf1588309e |
completed | March 6, 2026, 9:42 p.m. |
| NER | Named-entity recognition | batch_69abd9edba5c8190b86d6cba0f1964e2 |
completed | March 7, 2026, 7:55 a.m. |
| PD | Predicate disambiguation | batch_69abd81c9b4c81908e5e0da6ac5f828b |
completed | March 7, 2026, 7:47 a.m. |
Created at: March 6, 2026, 9:54 p.m.