Triple
T26840363
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Abt rack system |
E675759
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rack-and-pinion mechanism |
C48793
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rack-and-pinion mechanism Context triple: [Abt rack system, instanceOf, rack-and-pinion mechanism]
-
A.
mechanical gearing system
chosen
A mechanical gearing system is an arrangement of interlocking gears that transmits and modifies torque, speed, and direction of rotational motion between machine components.
-
B.
modular load-carrying system
A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
-
C.
operating arm
An operating arm is a mechanical component or assembly that transmits motion and force to perform controlled movements or operations within a machine or system.
-
D.
clock mechanism
A clock mechanism is the internal system of gears, springs, and regulators that converts stored or supplied energy into the precise, periodic movement of hands or indicators to measure and display time.
-
E.
roller coaster lift system
A roller coaster lift system is the mechanical assembly, typically using chains, cables, or linear motors, that raises coaster trains from the station to the initial peak to provide the potential energy needed for the ride.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9b8d5e88190a07d3455c0fbb21f |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:07 a.m.