Triple

T26840363
Position Surface form Disambiguated ID Type / Status
Subject Abt rack system E675759 entity
Predicate instanceOf P0 FINISHED
Object rack-and-pinion mechanism C48793 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rack-and-pinion mechanism
Context triple: [Abt rack system, instanceOf, rack-and-pinion mechanism]
  • A. mechanical gearing system chosen
    A mechanical gearing system is an arrangement of interlocking gears that transmits and modifies torque, speed, and direction of rotational motion between machine components.
  • B. modular load-carrying system
    A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
  • C. operating arm
    An operating arm is a mechanical component or assembly that transmits motion and force to perform controlled movements or operations within a machine or system.
  • D. clock mechanism
    A clock mechanism is the internal system of gears, springs, and regulators that converts stored or supplied energy into the precise, periodic movement of hands or indicators to measure and display time.
  • E. roller coaster lift system
    A roller coaster lift system is the mechanical assembly, typically using chains, cables, or linear motors, that raises coaster trains from the station to the initial peak to provide the potential energy needed for the ride.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9b8d5e88190a07d3455c0fbb21f completed April 27, 2026, 4:44 a.m.
Created at: April 27, 2026, 5:07 a.m.