Triple

T26814771
Position Surface form Disambiguated ID Type / Status
Subject Dakota Access Pipeline E672094 entity
Predicate constructionHaltedBy P5778 FINISHED
Object Barack Obama administration NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barack Obama administration | Statement: [Dakota Access Pipeline, constructionHaltedBy, Barack Obama administration]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionHaltedBy
Context triple: [Dakota Access Pipeline, constructionHaltedBy, Barack Obama administration]
  • A. constructionHalted
    Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
  • B. constructionInterruptedBy chosen
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • C. halted
    Indicates that an ongoing process, action, or movement has been stopped or brought to an end.
  • D. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • E. implementationHaltedBy
    Indicates that the progress or continuation of an implementation is stopped or interrupted due to a specified cause or agent.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb3225a3c8190aaf6746efeded2f3 completed April 27, 2026, 12:51 a.m.
NER Named-entity recognition batch_69f661b58ac48190907b6c6e9ccc2c59 completed May 2, 2026, 8:42 p.m.
PD Predicate disambiguation batch_69f660eea4648190b0d5e24293607813 completed May 2, 2026, 8:39 p.m.
Created at: April 27, 2026, 4:31 a.m.