Triple

T26796750
Position Surface form Disambiguated ID Type / Status
Subject Metropolitan Subdivision (CSX Transportation) E670973 entity
Predicate instanceOf P0 FINISHED
Object CSX Transportation line C1439 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CSX Transportation line
Context triple: [Metropolitan Subdivision (CSX Transportation), instanceOf, CSX Transportation line]
  • A. Maine Central Railroad line
    A Maine Central Railroad line is a specific railway route or segment operated by the Maine Central Railroad, used for transporting passengers and freight across designated regions in New England.
  • B. Amtrak Thruway Motorcoach route
    An Amtrak Thruway Motorcoach route is a scheduled bus service that connects passengers to and from Amtrak train stations, extending rail network coverage to areas not directly served by trains.
  • C. common carrier railroad
    A common carrier railroad is a rail transport company that offers freight and/or passenger services to the general public under legal obligation to serve all customers without discrimination, according to published rates and schedules.
  • D. railroad line chosen
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • E. freight railroad company
    A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb31fbd888190a82dac5822e453bc completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 4:20 a.m.