Triple

T26792057
Position Surface form Disambiguated ID Type / Status
Subject Malaysia–Singapore Points of Agreement of 1990 E670543 entity
Predicate instanceOf P0 FINISHED
Object Malaysia–Singapore bilateral agreement C44101 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Malaysia–Singapore bilateral agreement
Context triple: [Malaysia–Singapore Points of Agreement of 1990, instanceOf, Malaysia–Singapore bilateral agreement]
  • A. China–Singapore cooperative project
    A China–Singapore cooperative project is a jointly planned and implemented initiative between Chinese and Singaporean entities aimed at promoting mutual economic, technological, cultural, or infrastructural development.
  • B. bilateral economic agreement
    A bilateral economic agreement is a formal arrangement between two countries that establishes rules and commitments to govern their economic relations, such as trade, investment, and financial cooperation.
  • C. Act of Parliament of Singapore
    An Act of Parliament of Singapore is a written law formally enacted by the Singapore Parliament, receiving Presidential assent and forming part of the nation’s primary legislation.
  • D. bilateral diplomatic agreement chosen
    A bilateral diplomatic agreement is a formal, negotiated arrangement between two sovereign states that defines mutual rights, obligations, and cooperative actions in specific areas of shared interest.
  • E. ASEAN legal instrument
    An ASEAN legal instrument is a formal, collectively agreed document adopted by ASEAN member states that establishes binding or non-binding rules, commitments, or cooperative frameworks within the Association of Southeast Asian Nations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb31d45f8819089f52ebdbc556218 completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 4:17 a.m.