Triple
T26792057
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Malaysia–Singapore Points of Agreement of 1990 |
E670543
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Malaysia–Singapore bilateral agreement |
C44101
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Malaysia–Singapore bilateral agreement Context triple: [Malaysia–Singapore Points of Agreement of 1990, instanceOf, Malaysia–Singapore bilateral agreement]
-
A.
China–Singapore cooperative project
A China–Singapore cooperative project is a jointly planned and implemented initiative between Chinese and Singaporean entities aimed at promoting mutual economic, technological, cultural, or infrastructural development.
-
B.
bilateral economic agreement
A bilateral economic agreement is a formal arrangement between two countries that establishes rules and commitments to govern their economic relations, such as trade, investment, and financial cooperation.
-
C.
Act of Parliament of Singapore
An Act of Parliament of Singapore is a written law formally enacted by the Singapore Parliament, receiving Presidential assent and forming part of the nation’s primary legislation.
-
D.
bilateral diplomatic agreement
chosen
A bilateral diplomatic agreement is a formal, negotiated arrangement between two sovereign states that defines mutual rights, obligations, and cooperative actions in specific areas of shared interest.
-
E.
ASEAN legal instrument
An ASEAN legal instrument is a formal, collectively agreed document adopted by ASEAN member states that establishes binding or non-binding rules, commitments, or cooperative frameworks within the Association of Southeast Asian Nations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb31d45f8819089f52ebdbc556218 |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 4:17 a.m.