Triple

T26792026
Position Surface form Disambiguated ID Type / Status
Subject Tuas South Incineration Plant E670542 entity
Predicate instanceOf P0 FINISHED
Object incineration plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: incineration plant
Context triple: [Tuas South Incineration Plant, instanceOf, incineration plant]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • C. radioactive waste processing facility
    A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
  • D. industrial waste site
    An industrial waste site is a designated area where byproducts, residues, and discarded materials from industrial processes are stored, treated, or disposed of, often requiring specialized management to prevent environmental contamination.
  • E. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb31d45f8819089f52ebdbc556218 completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 4:17 a.m.