Triple
T26784300
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Galleria stradale del Colle di Tenda |
E670336
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transalpine transport infrastructure |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transalpine transport infrastructure Context triple: [Galleria stradale del Colle di Tenda, instanceOf, transalpine transport infrastructure]
-
A.
transalpine railway
A transalpine railway is a rail line that crosses or traverses the Alps, typically using tunnels, viaducts, and mountain passes to connect regions on either side of the mountain range.
-
B.
transalpine trade route
A transalpine trade route is a transportation corridor that crosses the Alps to facilitate the movement of goods, people, and cultural exchange between regions on either side of the mountain range.
-
C.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
transport infrastructure agreement
A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
-
E.
cross-Channel transport infrastructure
Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb31d45f8819089f52ebdbc556218 |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 4:11 a.m.