Triple
T26756835
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | كورنيش الروشة |
E674694
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | وجهة ترفيهية |
C1309
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: وجهة ترفيهية Context triple: [كورنيش الروشة, instanceOf, وجهة ترفيهية]
-
A.
entertainment facility
An entertainment facility is a venue designed and equipped to provide recreational, cultural, or leisure activities to individuals or groups, such as theaters, amusement parks, sports arenas, or gaming centers.
-
B.
holiday park
A holiday park is a designated recreational area offering accommodation, leisure facilities, and organized activities for individuals, families, or groups on vacation.
-
C.
entertainment district
chosen
An entertainment district is a designated urban area concentrated with venues such as theaters, bars, clubs, restaurants, and other leisure attractions that cater to nightlife and recreational activities.
-
D.
tourist attraction
A tourist attraction is a place, event, or feature that draws visitors due to its cultural, historical, natural, recreational, or entertainment value.
-
E.
tourist facility
A tourist facility is a place or establishment that provides services, amenities, or attractions specifically designed to accommodate and enhance the experience of visitors and travelers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eecda6e9dc81908452fab3ba17ed9b |
completed | April 27, 2026, 2:44 a.m. |
Created at: April 27, 2026, 3:56 a.m.