Triple

T26754444
Position Surface form Disambiguated ID Type / Status
Subject Burghead Fort E674633 entity
Predicate instanceOf P0 FINISHED
Object Pictish promontory fort C13727 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Pictish promontory fort
Context triple: [Burghead Fort, instanceOf, Pictish promontory fort]
  • A. hill fort
    A hill fort is a fortified settlement built on elevated ground, typically featuring defensive earthworks, walls, and ditches to control and protect the surrounding area.
  • B. Neolithic henge
    A Neolithic henge is a prehistoric earthwork monument characterized by a circular or oval bank and internal ditch, often associated with ritual, ceremonial, or astronomical functions.
  • C. prehistoric platform mound
    A prehistoric platform mound is a human-made earthen or stone elevation constructed in ancient times, typically serving as a base for structures, ceremonies, or elite residences within a broader cultural or ritual landscape.
  • D. Anglo-Saxon burial mound
    An Anglo-Saxon burial mound is an earthen or stone-built barrow constructed in early medieval England to cover and mark the grave of an individual, often accompanied by grave goods and sometimes elaborate funerary structures.
  • E. fortified settlement chosen
    A fortified settlement is a community enclosed by defensive structures such as walls, ramparts, or palisades, designed to protect its inhabitants and resources from external threats.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda6e9dc81908452fab3ba17ed9b completed April 27, 2026, 2:44 a.m.
Created at: April 27, 2026, 3:55 a.m.