Triple
T26751654
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bobsled Coaster |
E674555
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roller coaster type |
C4775
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roller coaster type Context triple: [Bobsled Coaster, instanceOf, roller coaster type]
-
A.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
B.
roller coaster variant
chosen
A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
-
C.
roller coaster model type
A roller coaster model type is a classification of roller coaster designs based on their structural configuration, track layout, train style, and ride experience characteristics.
-
D.
roller coaster concept
A roller coaster concept is a high-level design blueprint that defines the ride’s theme, layout, key elements, and overall experience before detailed engineering and construction begin.
-
E.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eecda6e9dc81908452fab3ba17ed9b |
completed | April 27, 2026, 2:44 a.m. |
Created at: April 27, 2026, 3:53 a.m.