Triple

T26733042
Position Surface form Disambiguated ID Type / Status
Subject Rivers of America E674026 entity
Predicate instanceOf P0 FINISHED
Object themed artificial waterway C26460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: themed artificial waterway
Context triple: [Rivers of America, instanceOf, themed artificial waterway]
  • A. engineered waterway chosen
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • B. man-made waterfall
    A man-made waterfall is an artificial structure designed to mimic the appearance and flow of a natural waterfall, typically created for aesthetic, recreational, or environmental purposes.
  • C. baroque waterway
    A baroque waterway is an ornately designed canal or watercourse, often integrated into grand landscapes or urban plans, characterized by elaborate curves, decorative features, and dramatic visual perspectives typical of the Baroque style.
  • D. man-made basin
    A man-made basin is an artificially constructed depression or container designed to hold or manage water or other liquids for purposes such as storage, irrigation, drainage, or industrial use.
  • E. artificial lake district
    An artificial lake district is a planned landscape of man-made lakes and surrounding infrastructure designed for purposes such as water management, recreation, tourism, and regional development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda57ab481909424e98f2835e7d8 completed April 27, 2026, 2:44 a.m.
Created at: April 27, 2026, 3:46 a.m.