Triple

T26727275
Position Surface form Disambiguated ID Type / Status
Subject PAM-D stage failed to provide required velocity E673867 entity
Predicate instanceOf P0 FINISHED
Object spaceflight mission failure event C32203 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spaceflight mission failure event
Context triple: [PAM-D stage failed to provide required velocity, instanceOf, spaceflight mission failure event]
  • A. failed space mission chosen
    A failed space mission is an attempted journey or operation beyond Earth's atmosphere that does not achieve its primary objectives due to technical, human, environmental, or organizational factors.
  • B. spaceflight accident
    A spaceflight accident is an unplanned, harmful event occurring during any phase of a space mission—launch, in-space operations, or reentry—that results in damage to spacecraft, cargo, or loss of human life.
  • C. cancelled launch vehicle
    A cancelled launch vehicle is a rocket or spacecraft design whose development or deployment was terminated before it could enter regular operational service.
  • D. space mission
    A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
  • E. spaceflight achievement
    A spaceflight achievement is a significant milestone or breakthrough in the development, execution, or impact of missions that travel beyond Earth's atmosphere.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda481d08190aea69f2f7c745f56 completed April 27, 2026, 2:44 a.m.
Created at: April 27, 2026, 3:43 a.m.