Triple

T26719863
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle landings E673672 entity
Predicate instanceOf P0 FINISHED
Object component of Space Shuttle program C51956 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: component of Space Shuttle program
Context triple: [Space Shuttle landings, instanceOf, component of Space Shuttle program]
  • A. NASA program component
    A NASA program component is a distinct organizational, technical, or operational element within a broader NASA program that contributes specific capabilities, resources, or functions toward achieving the program’s mission objectives.
  • B. NASA mission component
    A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
  • C. Space Shuttle payload module
    A Space Shuttle payload module is a specialized, modular structure designed to house, support, and interface scientific instruments, cargo, or satellites within the Shuttle’s payload bay for deployment or on-orbit operations.
  • D. Space Shuttle subsystem
    A Space Shuttle subsystem is a distinct functional component or collection of components within the Space Shuttle that performs a specific role—such as propulsion, life support, guidance, or power management—to enable safe and effective mission operations.
  • E. Space Shuttle mission
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda481d08190aea69f2f7c745f56 completed April 27, 2026, 2:44 a.m.
Created at: April 27, 2026, 3:40 a.m.