Triple

T26697232
Position Surface form Disambiguated ID Type / Status
Subject GO TO 2040 comprehensive regional plan E673054 entity
Predicate planningPeriodEndYear P127678 FINISHED
Object 2040 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2040 | Statement: [GO TO 2040 comprehensive regional plan, planningPeriodEndYear, 2040]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningPeriodEndYear
Context triple: [GO TO 2040 comprehensive regional plan, planningPeriodEndYear, 2040]
  • A. planningYear
    Indicates the year in which planning or preparation activities for something are scheduled or designated to occur.
  • B. plannedEndYear chosen
    Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
  • C. commitmentPeriodEndYear
    Indicates the year in which a specified commitment period concludes.
  • D. endYear
    Indicates the year in which an event, state, or relationship comes to an end.
  • E. planningStartYear
    Indicates the calendar year in which planning for an activity, project, or process begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda2b49c8190a6c481cfc4c07954 completed April 27, 2026, 2:44 a.m.
NER Named-entity recognition batch_69f6640168948190811bd5f933a87cf5 completed May 2, 2026, 8:52 p.m.
PD Predicate disambiguation batch_69f6633451948190bcc0410602bb4914 completed May 2, 2026, 8:48 p.m.
Created at: April 27, 2026, 3:29 a.m.