Triple

T26649724
Position Surface form Disambiguated ID Type / Status
Subject Tuas Power Station E669017 entity
Predicate instanceOf P0 FINISHED
Object Natural gas-fired power plant C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Natural gas-fired power plant
Context triple: [Tuas Power Station, instanceOf, Natural gas-fired power plant]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • D. natural gas field
    A natural gas field is a subsurface accumulation of natural gas trapped in porous rock formations, typically exploited through drilling and production infrastructure for commercial energy use.
  • E. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d00eb5481908d6c6d0ada2f0c9a completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:32 a.m.