Triple
T26648788
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Second Link Expressway |
E668992
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international road crossing |
C1133
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international road crossing Context triple: [Second Link Expressway, instanceOf, international road crossing]
-
A.
international border crossing
An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
-
B.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
C.
road border crossing
chosen
A road border crossing is a designated point along a roadway where vehicles and travelers legally pass between two jurisdictions or countries, typically featuring customs, immigration, and security controls.
-
D.
road–rail border crossing
A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
-
E.
group of international border crossings
A group of international border crossings is a collection of geographically or administratively related points where people, goods, and vehicles are legally permitted to pass between two or more countries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee9d00eb5481908d6c6d0ada2f0c9a |
completed | April 26, 2026, 11:17 p.m. |
Created at: April 27, 2026, 2:32 a.m.