Triple
T26642152
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Srisailam Ropeway to Patala Ganga |
E668809
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cable car transport system |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cable car transport system Context triple: [Srisailam Ropeway to Patala Ganga, instanceOf, cable car transport system]
-
A.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
B.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
C.
mountain tramway
A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
-
D.
cable car pioneer
A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
-
E.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee9d0024b8819090a7c8cf669a3b6c |
completed | April 26, 2026, 11:17 p.m. |
Created at: April 27, 2026, 2:29 a.m.