Triple

T26642151
Position Surface form Disambiguated ID Type / Status
Subject Srisailam Ropeway to Patala Ganga E668809 entity
Predicate instanceOf P0 FINISHED
Object ropeway system C34774 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ropeway system
Context triple: [Srisailam Ropeway to Patala Ganga, instanceOf, ropeway system]
  • A. ropeway chosen
    A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
  • B. elevated expressway
    An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
  • C. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • D. causeway system
    A causeway system is an integrated network of raised roads or pathways, often built over waterlogged or low-lying terrain, designed to provide stable, reliable access between otherwise separated land areas.
  • E. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d0024b8819090a7c8cf669a3b6c completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:29 a.m.