Triple

T26632574
Position Surface form Disambiguated ID Type / Status
Subject Neo-Islamic architecture E668539 entity
Predicate usesConstructionTechnology P156711 FINISHED
Object modern structural engineering LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: modern structural engineering | Statement: [Neo-Islamic architecture, usesConstructionTechnology, modern structural engineering]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usesConstructionTechnology
Context triple: [Neo-Islamic architecture, usesConstructionTechnology, modern structural engineering]
  • A. constructionUsed
    Indicates that one entity was employed as a construction method, material, or component in creating or assembling another entity.
  • B. constructionUses chosen
    Indicates that a construction activity, project, or structure makes use of a specified material, method, tool, or resource.
  • C. constructionTechniqueComparedTo
    Indicates a relationship where one construction technique is evaluated or contrasted against another in terms of method, quality, efficiency, or other relevant criteria.
  • D. hasConstruction
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • E. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d0024b8819090a7c8cf669a3b6c completed April 26, 2026, 11:17 p.m.
NER Named-entity recognition batch_69f67c9fe7b48190b79b4041357edb49 completed May 2, 2026, 10:37 p.m.
PD Predicate disambiguation batch_69f678cc272081909e5c70f1bc7407f0 completed May 2, 2026, 10:21 p.m.
Created at: April 27, 2026, 2:25 a.m.