Triple

T26632532
Position Surface form Disambiguated ID Type / Status
Subject Cairo tram network E668538 entity
Predicate gradualProcess P161074 FINISHED
Object dismantling LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: dismantling | Statement: [Cairo tram network, gradualProcess, dismantling]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gradualProcess
Context triple: [Cairo tram network, gradualProcess, dismantling]
  • A. graduallyEmbraces
    Indicates a relationship in which one entity slowly and progressively accepts, adopts, or takes in another entity or its influence over time.
  • B. typicalProcess
    Indicates that the related process is characteristic, usual, or commonly occurring for the given entity or context.
  • C. progressedBy
    Indicates that an activity, process, or state advances or moves forward as a result of the actions or influence of a specified agent or factor.
  • D. adoptedGraduallyBy
    Indicates that one entity is taken up, accepted, or implemented by another entity in a slow, incremental, or phased manner over time.
  • E. broaderProcess
    Indicates that one process encompasses, includes, or provides the larger context for another, more specific process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d0024b8819090a7c8cf669a3b6c completed April 26, 2026, 11:17 p.m.
NER Named-entity recognition batch_69f615ef22948190a908a048dc739479 completed May 2, 2026, 3:19 p.m.
PD Predicate disambiguation batch_69f60b8bb0d08190ab5a9a2a8847c6f4 completed May 2, 2026, 2:34 p.m.
PDg Predicate description generation batch_69f60f24ed608190bffe6c6084fc2f7a completed May 2, 2026, 2:50 p.m.
Created at: April 27, 2026, 2:25 a.m.