Triple

T26632515
Position Surface form Disambiguated ID Type / Status
Subject Cairo tram network E668538 entity
Predicate instanceOf P0 FINISHED
Object defunct public transport system C42366 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: defunct public transport system
Context triple: [Cairo tram network, instanceOf, defunct public transport system]
  • A. defunct transit operator
    A defunct transit operator is a former organization or company that once provided public transportation services but has since ceased operations, often due to financial, regulatory, or structural changes in the transit system.
  • B. former transit system chosen
    A former transit system is a previously operational network of public transportation services—such as buses, trains, or trams—that has been discontinued, dismantled, or replaced.
  • C. defunct railroad
    A defunct railroad is a former railway company or line that has ceased operations, often leaving behind abandoned tracks, rights-of-way, or repurposed infrastructure.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d0024b8819090a7c8cf669a3b6c completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:25 a.m.