Triple

T26611872
Position Surface form Disambiguated ID Type / Status
Subject Isaac Rice E667945 entity
Predicate instanceOf P0 FINISHED
Object submarine industry pioneer C51821 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: submarine industry pioneer
Context triple: [Isaac Rice, instanceOf, submarine industry pioneer]
  • A. military submarine
    A military submarine is a stealth-capable naval vessel designed to operate underwater for extended periods to conduct surveillance, reconnaissance, and combat missions.
  • B. submarine production block
    A submarine production block is a modular, pre-fabricated section of a submarine’s structure and systems that is built separately and later integrated into the full vessel during assembly.
  • C. submarine production variant
    A submarine production variant is a specific, standardized version of a submarine design built in quantity, incorporating defined configurations, systems, and modifications distinct from other variants in the same class.
  • D. Victoria-class submarine
    The Victoria-class submarine is a class of diesel-electric, conventionally powered attack submarines operated by the Royal Canadian Navy, designed for stealthy coastal defense, surveillance, and anti-submarine warfare.
  • E. military submarine class
    A military submarine class is a category of submarines sharing a common design, capabilities, and purpose, typically defined by their size, propulsion, armament, and intended operational roles.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9cfe16088190a3dddd68e3c7b1ea completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:17 a.m.