Triple

T26599589
Position Surface form Disambiguated ID Type / Status
Subject Friedrichshafen–Romanshorn ferry E667596 entity
Predicate instanceOf P0 FINISHED
Object cross-border transport service C27152 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-border transport service
Context triple: [Friedrichshafen–Romanshorn ferry, instanceOf, cross-border transport service]
  • A. cross-border transport link
    A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
  • B. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • C. cross‑border operation chosen
    A cross-border operation is an organized activity or transaction conducted across the legal, regulatory, or geographic boundaries of two or more countries.
  • D. international border crossing
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • E. border crossing
    A border crossing is a designated point where people, vehicles, and goods are legally inspected and allowed to pass from one country or jurisdiction into another.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9cfc385081909ac9ae178030a06e completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:11 a.m.