Triple

T26593962
Position Surface form Disambiguated ID Type / Status
Subject Action Area IIB E667436 entity
Predicate instanceOf P0 FINISHED
Object planned sector C51800 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned sector
Context triple: [Action Area IIB, instanceOf, planned sector]
  • A. planned development
    A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
  • B. public sector investment schedule
    A public sector investment schedule is a planned timeline and allocation of government capital expenditures across projects and sectors to achieve specified policy, economic, and social objectives.
  • C. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • D. public sector enterprise
    A public sector enterprise is an organization owned and operated by the government to provide goods or services, often with broader social or strategic objectives beyond profit.
  • E. planning district
    A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9cfc385081909ac9ae178030a06e completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:09 a.m.