Triple
T26579667
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tomorrowland Transit Authority PeopleMover |
E667043
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevated people mover ride |
C538
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevated people mover ride Context triple: [Tomorrowland Transit Authority PeopleMover, instanceOf, elevated people mover ride]
-
A.
people mover system
chosen
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
B.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
C.
automated people mover vehicle
An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
-
D.
Ferris wheel
A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
-
E.
carousel-style ride
A carousel-style ride is an amusement attraction featuring a rotating circular platform with seats, often shaped like animals or vehicles, that move up and down as the ride spins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee9cfb7e548190b60a9031182f5a7e |
completed | April 26, 2026, 11:17 p.m. |
Created at: April 27, 2026, 2:02 a.m.