Triple

T26523990
Position Surface form Disambiguated ID Type / Status
Subject Midcontinent Independent System Operator region E670635 entity
Predicate instanceOf P0 FINISHED
Object bulk power system region C27230 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bulk power system region
Context triple: [Midcontinent Independent System Operator region, instanceOf, bulk power system region]
  • A. power-generation region
    A power-generation region is a geographic area or zone designated for producing electrical energy, typically characterized by concentrated energy infrastructure such as power plants, renewable installations, and associated transmission facilities.
  • B. electricity market region
    An electricity market region is a geographically defined area within which electricity generation, transmission, distribution, and trading are coordinated under a common set of market rules, regulatory frameworks, and grid operations.
  • C. regional transmission organization chosen
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • D. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • E. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb31ea1e08190b9ff43cf9bc25bf8 completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 1:30 a.m.