Triple

T26509273
Position Surface form Disambiguated ID Type / Status
Subject Forth Road Bridge steelwork (contractor) E669633 entity
Predicate instanceOf P0 FINISHED
Object engineering contract C51666 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering contract
Context triple: [Forth Road Bridge steelwork (contractor), instanceOf, engineering contract]
  • A. engineering work
    Engineering work is the systematic application of scientific, mathematical, and technical principles to design, develop, analyze, and maintain structures, systems, devices, or processes that solve practical problems.
  • B. engineering law
    Engineering law is the body of legal principles, regulations, and ethical standards that govern the practice, responsibilities, and liabilities of engineers in the design, development, and operation of technological systems.
  • C. engineering service
    An engineering service is a professional offering that applies scientific and technical expertise to design, analyze, develop, or maintain systems, structures, or processes to meet specific client or project needs.
  • D. engineering insurance company
    An engineering insurance company is a specialized insurer that provides coverage for risks associated with engineering projects, machinery, construction works, and related technical operations.
  • E. engineering structure
    An engineering structure is a designed and constructed system of connected components that safely resists and transmits loads to fulfill a specific functional purpose in the built environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb319ec70819090834c2591cf5f1e completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 1:19 a.m.