Triple
T26509273
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Forth Road Bridge steelwork (contractor) |
E669633
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering contract |
C51666
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering contract Context triple: [Forth Road Bridge steelwork (contractor), instanceOf, engineering contract]
-
A.
engineering work
Engineering work is the systematic application of scientific, mathematical, and technical principles to design, develop, analyze, and maintain structures, systems, devices, or processes that solve practical problems.
-
B.
engineering law
Engineering law is the body of legal principles, regulations, and ethical standards that govern the practice, responsibilities, and liabilities of engineers in the design, development, and operation of technological systems.
-
C.
engineering service
An engineering service is a professional offering that applies scientific and technical expertise to design, analyze, develop, or maintain systems, structures, or processes to meet specific client or project needs.
-
D.
engineering insurance company
An engineering insurance company is a specialized insurer that provides coverage for risks associated with engineering projects, machinery, construction works, and related technical operations.
-
E.
engineering structure
An engineering structure is a designed and constructed system of connected components that safely resists and transmits loads to fulfill a specific functional purpose in the built environment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb319ec70819090834c2591cf5f1e |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 1:19 a.m.