Triple

T26509272
Position Surface form Disambiguated ID Type / Status
Subject Forth Road Bridge steelwork (contractor) E669633 entity
Predicate instanceOf P0 FINISHED
Object construction contract C51665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction contract
Context triple: [Forth Road Bridge steelwork (contractor), instanceOf, construction contract]
  • A. construction site
    A construction site is a designated area where buildings, infrastructure, or other structures are actively being built, renovated, or demolished using labor, machinery, and materials.
  • B. construction technique
    A construction technique is a specific method or process used to assemble materials and components into a built structure safely, efficiently, and according to design requirements.
  • C. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • D. construction industry partnership
    A construction industry partnership is a collaborative alliance between contractors, suppliers, designers, and other stakeholders formed to jointly plan, finance, and deliver construction projects more efficiently and profitably.
  • E. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb319ec70819090834c2591cf5f1e completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 1:19 a.m.