Triple
T26508678
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beas Project |
E669620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation and hydropower scheme |
C19469
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation and hydropower scheme Context triple: [Beas Project, instanceOf, irrigation and hydropower scheme]
-
A.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
B.
planned hydroelectric power station
A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
-
C.
hydroelectric power complex
chosen
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
D.
heritage irrigation system
A heritage irrigation system is a historically significant network of water management structures and practices preserved for their cultural, technological, and agricultural value.
-
E.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb319ec70819090834c2591cf5f1e |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 1:18 a.m.