Triple

T2650230
Position Surface form Disambiguated ID Type / Status
Subject Pella E53880 entity
Predicate instanceOf P0 FINISHED
Object window and door manufacturer C136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: window and door manufacturer
Context triple: [Pella, instanceOf, window and door manufacturer]
  • A. manufacturing company chosen
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • B. HVAC company
    A HVAC company is a business that specializes in the installation, maintenance, and repair of heating, ventilation, and air conditioning systems for residential, commercial, or industrial clients.
  • C. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • D. stained-glass window
    A stained-glass window is a decorative architectural element made of colored glass pieces arranged in patterns or images, typically held together by lead strips and illuminated by transmitted light.
  • E. carpenter
    A carpenter is a skilled tradesperson who constructs, installs, and repairs structures and fixtures made primarily of wood and related materials.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab495e192081909c77b622e8e7e15a completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:53 p.m.