Triple
T26501802
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sugar Hill Mixed-Use Development, Harlem |
E669442
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | community facility building |
C12924
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: community facility building Context triple: [Sugar Hill Mixed-Use Development, Harlem, instanceOf, community facility building]
-
A.
utility-related building
A utility-related building is a structure designed to support essential infrastructure services such as power, water, waste management, or telecommunications.
-
B.
community park
A community park is a public outdoor space designed to provide local residents with areas for recreation, relaxation, social interaction, and connection with nature.
-
C.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
D.
multi-purpose facility
chosen
A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
-
E.
public service facility
A public service facility is a place or infrastructure provided by government or community organizations to deliver essential services such as health, safety, education, or administration to the public.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb319ec70819090834c2591cf5f1e |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 1:13 a.m.