Triple
T26486149
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 391 (magazine) |
E664827
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | arts magazine |
C303
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: arts magazine Context triple: [391 (magazine), instanceOf, arts magazine]
-
A.
magazine
chosen
A magazine is a periodically published collection of articles, stories, photographs, and advertisements centered around specific themes or interests, typically distributed in printed or digital format.
-
B.
magazine article
A magazine article is a non-fiction written piece published in a periodical that explores a specific topic, event, or issue in depth for a general or targeted audience.
-
C.
interiors magazine
A curated periodical that showcases interior design ideas, trends, and inspiration through photographs, articles, and expert advice on decorating and styling living spaces.
-
D.
contemporary art publication
A contemporary art publication is a curated print or digital periodical or book that documents, critiques, and contextualizes current artistic practices, exhibitions, and discourses.
-
E.
photographic art journal
A photographic art journal is a curated, often personal publication that combines original photographs with artistic layouts, text, and design elements to explore visual narratives, concepts, or themes over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee883bc85481909885f92415cbce33 |
completed | April 26, 2026, 9:48 p.m. |
Created at: April 27, 2026, 12:30 a.m.