Triple

T26480714
Position Surface form Disambiguated ID Type / Status
Subject Mapo Bridge E664675 entity
Predicate instanceOf P0 FINISHED
Object bridge over the Han River C47958 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge over the Han River
Context triple: [Mapo Bridge, instanceOf, bridge over the Han River]
  • A. 교량 chosen
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • B. Busan Metro station
    A Busan Metro station is a designated facility along the Busan subway network where trains stop to allow passengers to board, alight, and transfer between lines or other modes of transportation.
  • C. Gwangju Metro station
    A Gwangju Metro station is a designated public transit facility within the Gwangju Metropolitan Subway system where passengers access, board, and transfer between metro trains.
  • D. Pyongyang Metro station
    A Pyongyang Metro station is an underground public transit facility in North Korea’s capital that serves as a stop for metro trains, providing passenger access, ticketing, and platform services within the Pyongyang Metro system.
  • E. 미완공 건물
    미완공 건물은 설계와 골조 등 일부 공사가 진행되었으나 사용 가능 단계까지 모든 건축 공정이 완료되지 않은 상태의 건축물을 의미한다.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883bc85481909885f92415cbce33 completed April 26, 2026, 9:48 p.m.
Created at: April 27, 2026, 12:26 a.m.