Triple

T26478368
Position Surface form Disambiguated ID Type / Status
Subject Duy Tien Town E666102 entity
Predicate instanceOf P0 FINISHED
Object local economic center C21102 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: local economic center
Context triple: [Duy Tien Town, instanceOf, local economic center]
  • A. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • B. regional center
    A regional center is an organization or facility that provides specialized services, coordination, and support to a defined geographic area, often acting as a hub for resources, administration, or expertise.
  • C. regional economy
    A regional economy is the interconnected system of production, consumption, labor, and trade within a specific geographic area, shaped by local resources, industries, institutions, and policies.
  • D. suburban centre chosen
    A suburban centre is a focal area within a suburb that concentrates retail, services, and community facilities, serving as a local hub for surrounding residential neighborhoods.
  • E. former town center
    A former town center is a once-primary hub of civic, commercial, and social activity that has lost its central role due to urban expansion, economic shifts, or administrative reorganization.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883f80dc819090e311b022b78e02 completed April 26, 2026, 9:48 p.m.
Created at: April 27, 2026, 12:25 a.m.