Triple
T26473146
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fox Point Hurricane Barrier |
E665954
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hurricane barrier |
C16241
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hurricane barrier Context triple: [Fox Point Hurricane Barrier, instanceOf, hurricane barrier]
-
A.
movable flood barrier
A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
-
B.
water barrier
chosen
A water barrier is a structure, material, or system designed to prevent or control the passage, infiltration, or flow of water between distinct areas or environments.
-
C.
barrier beach
A barrier beach is a long, narrow, offshore deposit of sand or sediment that runs parallel to the coastline, protecting the shore from waves and storms while creating sheltered waters behind it.
-
D.
seawall
A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
-
E.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee883f80dc819090e311b022b78e02 |
completed | April 26, 2026, 9:48 p.m. |
Created at: April 27, 2026, 12:21 a.m.