Triple
T26447253
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hill muscle model |
E665246
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | biomechanical model |
C324
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: biomechanical model Context triple: [Hill muscle model, instanceOf, biomechanical model]
-
A.
physical model
A physical model is a tangible, scaled, or otherwise material representation of an object, system, or phenomenon used to study, demonstrate, or predict its real-world behavior.
-
B.
modeling framework
A modeling framework is a structured set of concepts, methods, and tools used to construct, analyze, and interpret representations of real-world systems or phenomena.
-
C.
theoretical model
chosen
A theoretical model is an abstract, simplified representation of a system or phenomenon used to explain, predict, or understand its behavior based on underlying principles and assumptions.
-
D.
toy model
A toy model is a simplified, often idealized representation of a complex system used to illustrate key concepts, test ideas, or gain intuitive understanding without capturing all real-world details.
-
E.
modular load-carrying system
A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee883d5040819097dd154643005230 |
completed | April 26, 2026, 9:48 p.m. |
Created at: April 27, 2026, 12:03 a.m.