Triple
T26432335
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hebron production platform |
E664543
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | offshore oil production platform |
C21091
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: offshore oil production platform Context triple: [Hebron production platform, instanceOf, offshore oil production platform]
-
A.
floating production storage and offloading vessel
A floating production storage and offloading vessel is an offshore ship-shaped facility that processes hydrocarbons from subsea wells, stores the produced oil, and offloads it to shuttle tankers for transport.
-
B.
offshore petroleum export facility
chosen
An offshore petroleum export facility is a marine-based installation that receives, stores, and transfers produced oil or gas from offshore fields to tankers or pipelines for transport to onshore markets.
-
C.
offshore oil and gas development project
An offshore oil and gas development project is a large-scale, capital-intensive initiative that plans, designs, constructs, and operates facilities at sea to extract, process, and transport hydrocarbons from subsea reservoirs to market.
-
D.
ExxonMobil facility
An ExxonMobil facility is a physical site owned or operated by ExxonMobil where petroleum, natural gas, or related chemical products are explored, produced, processed, stored, or distributed.
-
E.
maritime structure
A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee883ad6a4819088f918e76122d690 |
completed | April 26, 2026, 9:48 p.m. |
Created at: April 26, 2026, 11:50 p.m.