Triple

T26427265
Position Surface form Disambiguated ID Type / Status
Subject SPARQL Working Group E664402 entity
Predicate instanceOf P0 FINISHED
Object Technical committee C51549 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Technical committee
Context triple: [SPARQL Working Group, instanceOf, Technical committee]
  • A. technical subcommittee
    A technical subcommittee is a specialized group within a larger organization tasked with analyzing, developing, and recommending solutions on specific technical issues or standards.
  • B. technical committee system
    A technical committee system is an organized framework that manages the formation, coordination, decision-making, and documentation of expert groups responsible for developing, reviewing, and maintaining technical standards, policies, or solutions within an organization or domain.
  • C. technical architecture committee
    A technical architecture committee is a governing body of experts responsible for defining, reviewing, and guiding an organization’s technology architecture, standards, and strategic technical decisions.
  • D. technical expert group
    A technical expert group is a team of specialized professionals convened to provide in-depth technical analysis, guidance, and recommendations on specific subject-matter issues.
  • E. technical management board
    A technical management board is a governing body of senior experts responsible for overseeing, guiding, and making strategic decisions about an organization’s technical direction, standards, and priorities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883ad6a4819088f918e76122d690 completed April 26, 2026, 9:48 p.m.
Created at: April 26, 2026, 11:46 p.m.