Triple
T26386770
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MAPS (Metropolitan Area Projects) program |
E663302
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public infrastructure program |
C44543
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public infrastructure program Context triple: [MAPS (Metropolitan Area Projects) program, instanceOf, public infrastructure program]
-
A.
infrastructure funding program
chosen
An infrastructure funding program is a structured initiative that allocates financial resources to plan, build, upgrade, and maintain public facilities and systems such as transportation, utilities, and community services.
-
B.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
C.
infrastructure
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
D.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
E.
NASA program infrastructure
NASA program infrastructure encompasses the organizational structures, facilities, technologies, processes, and support systems that enable the planning, execution, and management of NASA’s missions and research programs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee88374adc81909868f3bab374a32f |
completed | April 26, 2026, 9:48 p.m. |
Created at: April 26, 2026, 11:22 p.m.