Triple

T26374269
Position Surface form Disambiguated ID Type / Status
Subject No. 303 Squadron maintenance personnel E660850 entity
Predicate workedShifts P7950 FINISHED
Object around-the-clock as required by operations LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: around-the-clock as required by operations | Statement: [No. 303 Squadron maintenance personnel, workedShifts, around-the-clock as required by operations]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: workedShifts
Context triple: [No. 303 Squadron maintenance personnel, workedShifts, around-the-clock as required by operations]
  • A. worksOver
    Indicates that one entity performs work that extends beyond or exceeds a certain limit, threshold, or standard associated with another entity.
  • B. workPeriod chosen
    Indicates the span of time during which an entity is engaged in a particular work or employment activity.
  • C. workedFrom
    Indicates that an entity was employed or actively engaged in work starting from a specified point in time.
  • D. timePeriodOfWorks
    Indicates the span of time during which the associated works were created, produced, or active.
  • E. workAfter
    Indicates that one entity performs its work or begins an activity only after another specified entity has completed or started its own work.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee812a698881908d6a58265995fa39 completed April 26, 2026, 9:18 p.m.
NER Named-entity recognition batch_69f6247480cc8190a887eedaeb94615c completed May 2, 2026, 4:21 p.m.
PD Predicate disambiguation batch_69f623a7539c8190b71797f583da9f63 completed May 2, 2026, 4:17 p.m.
Created at: April 26, 2026, 11 p.m.