Triple
T26372448
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Guernsey waterfront |
E660807
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | harborfront |
C453
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: harborfront Context triple: [Guernsey waterfront, instanceOf, harborfront]
-
A.
harbor
chosen
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
B.
harbor company
A harbor company is an organization that manages, operates, and maintains port facilities and related maritime services for the handling of ships, cargo, and passengers.
-
C.
harbour crossing
A harbour crossing is a transportation route or structure, such as a bridge, tunnel, or ferry service, that enables people and vehicles to travel across a harbour.
-
D.
harbour village
A harbour village is a small coastal settlement clustered around a sheltered port, where homes, shops, and community life center on fishing, boating, and maritime trade.
-
E.
harbor system
A harbor system is an integrated arrangement of physical infrastructure, navigational facilities, operational processes, and regulatory mechanisms that collectively enable the safe, efficient berthing, handling, and movement of vessels, cargo, and passengers within a coastal or inland port area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee812a698881908d6a58265995fa39 |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:59 p.m.