Triple

T26370305
Position Surface form Disambiguated ID Type / Status
Subject S7 Line E660755 entity
Predicate instanceOf P0 FINISHED
Object Nanjing Metro line C51470 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nanjing Metro line
Context triple: [S7 Line, instanceOf, Nanjing Metro line]
  • A. Metromover line
    A Metromover line is a designated route within an automated, elevated people-mover system that connects multiple stations along a fixed path in an urban area.
  • B. Shanghai Metro station
    A Shanghai Metro station is a designated public transit facility within the Shanghai Metro network where passengers access, board, transfer between, and alight from metro trains.
  • C. estación del Metro de la Ciudad de México
    Una estación del Metro de la Ciudad de México es una instalación de transporte público subterránea o superficial donde los trenes del sistema metro detienen su marcha para permitir el ascenso y descenso de pasajeros, conectando distintas zonas urbanas mediante una red ferroviaria masiva.
  • D. Metromover route
    A Metromover route is a predefined path within an automated downtown transit system that specifies the sequence of stations and track segments a Metromover vehicle follows to provide passenger service.
  • E. TransMilenio station
    A TransMilenio station is a designated public transit facility along Bogotá’s bus rapid transit network where passengers access, transfer between, and depart articulated buses via controlled platforms and fare systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee812a698881908d6a58265995fa39 completed April 26, 2026, 9:18 p.m.
Created at: April 26, 2026, 10:58 p.m.