Triple

T26362661
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 301 bridge E660248 entity
Predicate instanceOf P0 FINISHED
Object highway bridge C958 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee8126d52c8190bc0b34337c2c9aa8 completed April 26, 2026, 9:18 p.m.
Created at: April 26, 2026, 10:52 p.m.