Triple
T26357630
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | William Sidney Lovell-Smith |
E663110
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New Zealand printer |
C8673
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New Zealand printer Context triple: [William Sidney Lovell-Smith, instanceOf, New Zealand printer]
-
A.
New Zealander
chosen
A New Zealander is a person who is a citizen or resident of New Zealand, typically associated with its diverse cultures, landscapes, and social values.
-
B.
New Zealand government architect
A New Zealand government architect is a state-appointed design professional responsible for overseeing the planning, design, and quality of public buildings and infrastructure to meet national standards and public needs.
-
C.
royal printer
A royal printer is an official publisher appointed by a monarchy to produce and distribute authorized documents, proclamations, and other printed materials on behalf of the crown.
-
D.
New Zealand Crown entity
A New Zealand Crown entity is an organization that is part of the state sector but operates at arm’s length from ministers, performing public functions or services under specific statutory or government mandates.
-
E.
New Zealand organisation
A New Zealand organisation is a formally structured group or entity that operates within or is primarily associated with New Zealand to pursue specific goals, activities, or services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee8130fc44819094e5ab1da201cd7b |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:49 p.m.