Triple
T26345562
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Microformats |
E662770
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | semantic markup format |
C1700
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: semantic markup format Context triple: [Microformats, instanceOf, semantic markup format]
-
A.
semantic framework
A semantic framework is a structured system of concepts, rules, and relationships used to define, interpret, and reason about meaning within a particular domain or language.
-
B.
markup language
chosen
A markup language is a system for annotating text or data with tags that define its structure, presentation, or semantics, enabling consistent formatting and processing by software.
-
C.
markup language standard
A markup language standard is a formally defined set of rules and syntax for structuring, annotating, and representing data or documents in a consistent, interoperable format.
-
D.
symbolic text
Symbolic text is written content in which characters, words, or notations stand for abstract ideas, concepts, or entities beyond their literal meaning.
-
E.
syntax monograph
A syntax monograph is a detailed scholarly work that systematically analyzes and describes the syntactic structure and rules of a particular language or theoretical framework.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee81304194819092e20e0fae3aee07 |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:41 p.m.