Triple

T2634522
Position Surface form Disambiguated ID Type / Status
Subject Harry Beck E59712 entity
Predicate instanceOf P0 FINISHED
Object technical draftsman C11355 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technical draftsman
Context triple: [Harry Beck, instanceOf, technical draftsman]
  • A. mechanical engineer
    A mechanical engineer is a professional who applies principles of physics, mathematics, and materials science to design, analyze, manufacture, and maintain mechanical systems and devices.
  • B. engineering designation
    An engineering designation is a formal title or credential that identifies an engineer’s professional qualification, specialization, and level of responsibility within the engineering field.
  • C. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • D. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • E. Technical specification
    A technical specification is a detailed, formal document that precisely defines the functional, performance, and interface requirements of a system, component, or product to guide its design, implementation, and verification.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac8596c8190b34997e73d9e991c completed March 6, 2026, 9:44 p.m.
Created at: March 6, 2026, 9:50 p.m.