Triple

T2632943
Position Surface form Disambiguated ID Type / Status
Subject Keswick Dam E59675 entity
Predicate downstreamOf P5956 FINISHED
Object Shasta Dam E61058 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shasta Dam | Statement: [Keswick Dam, downstreamOf, Shasta Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shasta Dam
Context triple: [Keswick Dam, downstreamOf, Shasta Dam]
  • A. Shasta Dam chosen
    Shasta Dam is a large concrete gravity dam on California’s Sacramento River, forming Shasta Lake and serving as a key source of water storage, hydroelectric power, and flood control for the state.
  • B. Folsom Dam
    Folsom Dam is a large concrete dam on the American River in California that provides flood control, water storage, and hydroelectric power for the Sacramento region.
  • C. New Melones Dam
    New Melones Dam is a large multipurpose reservoir and hydroelectric facility on the Stanislaus River in California, providing water storage, flood control, and power generation.
  • D. Yuba Reservoir
    Yuba Reservoir is a man-made lake in central Utah popular for boating, fishing, and camping.
  • E. Castaic Dam
    Castaic Dam is a large embankment dam in Los Angeles County, California, that forms Castaic Lake and plays a key role in water storage and hydroelectric power generation for Southern California.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac8596c8190b34997e73d9e991c completed March 6, 2026, 9:44 p.m.
NER Named-entity recognition batch_69abd8c8d32c819081fc89b91217ed54 completed March 7, 2026, 7:50 a.m.
NED1 Entity disambiguation (via context triple) batch_69af90a996188190b3a83a31e69d09ef completed March 10, 2026, 3:31 a.m.
Created at: March 6, 2026, 9:50 p.m.